+86 136 0156 8070
  136 0156 8070
  • Product Name
  • Product Keyword
  • Product Model
  • Product Summary
  • Product Description
  • Multi Field Search
You are here: Home » Products » Fully Skid-Mounted Boiler » skid mounted system » Fully Skid-mounted System-LWS

Fully Skid-mounted System-LWS

Share to:

Fully skid-mounted design .Boiler and all auxiliary parts arrange together on one down base .Free of installation . Current all type boilers could arrange skid-mounted .

  • skid-mounted-system
  • wilford
Quantity:


Overview:

Fully skid-mounted design .Boiler and all auxiliary parts arrange together on one down base .Free of installation . Current all type boilers could arrange skid-mounted .

Fully skid mounted boiler system --production and assembly all finished before cargo delivery .User only need to arrange for necessary connection as well as electricity supply is enough .All system on one down base ,easily for move .Fully skid mounted system covers less room space .Easily for handling and operation .


Product Parameter
 Model LWS0.1-0.7-Y.Q LWS0.15-0.7-Y.Q LWS0.2-0.7-Y.Q LWS0.3-0.7-Y.Q
 Item  unit
Rated evaporation kg/h 100 150 200 300
Rated working pressure Mpa 0.7 0.7 0.7 0.7
Staturated steam temperature 170 170 170 170
Feed water temperature 20 20 20 20
 Weight T 0.6 0.68 0.8 1.1
Water capacity L 49 190 220 280
 fuelconsumption   diesel oil Kg/h 7.1 10.7 14.2 21.3
 natural gas Nm3/h 9.1 13.7 18.2 27.3
 LPG L/h 14.2 21.3 28.4 42.5
main steam valve      a  mm 25 25 32 32
safety valve              b mm 25 25 25 25
water inlet                c mm 15 15 15 15
drain valve               d mm 20 25 25 25
chimney                  e mm 133 159 159 219
 Overall size L mm 1020 1150 1150 1270
W mm 1080 1260 1260 1570
H mm 1750 1840 2140 2400
H1 mm 1480 1520 1820 2090
Whole Picture Appreciation:
Product Parameter List:
 Custom production accepted 


Product Detail Analysis:
 
Pipe connection diagram of boiler and sewage tank1.jpg Pipe connection diagram of boiler and sewage tank3.jpg
Pipe connection diagram of boiler and sewage tank-1 Pipe connection diagram of boiler and sewage tank-2
Piping diagram of boiler and fittings-2.jpg
blow off.jpg
Pipe connection diagram of boiler and sewage tank-3 Blowdown tank
Temperature sensor and pressure gauge.jpg temperature controller.jpg
Temperature sensor and pressure gauge temperature controller
dosing pump .jpg Soft water tank and water treatment.jpg
dosing pump Soft water tank and water treatment




   

Technological Process:

Packaging & Shipping:

LSS packing.jpg

Our Customer:

Our Services:
For each user, we have detailed understanding and analysis of their different production environment and the shortage of the products, so that to provide reasonable technical solution and timely after-sales service.We attach great importance to the effective operation of boiler product system to provide customers with solutions to problems, at the same time to sent experienced engineer to on-site guidance.The company has accumulated rich experience in the scene to deal with problems,which provides strong technical support and perfect after-sales service to the equipment we manufactured.Only users success is our success


Company Information:

Wilford occupies market by good quality and gets respect by good faith.Wilford Thermal has B class special equipment manufacturing license.the certification of ISO9001 quality system.the Famous brand product of SuZhou,the certifications of satety radiancy license.Meanwhile Wilford gets authorization of patent rights of high-tech products and keeps increasing.Wilford Thermal insists on R&D as company development's core.

Established in 1998, Zhangjiagang Wilford Thermal Co.,Ltd. Is specialized in the production of oil, gas, electric heating steam boilers, hot water boilers, biomass-fired boilers and other energy saving and environmental-protective equipment, which is a licensed B-class boiler manufacturer with the U.S.ASME(American Society of Mechanical Engineers) factory authentication and ISO9000:2008 quality system certification.

Contact Us:
No5,Nanyuan Road Economic Development Zone, Zhangjiagang
Tel: +86-512-5817 0166
Fax: +86-512-5869 8850
Email: 
manager@wilfordboiler.com
WhatsApp: +86 136 0156 8070
WeChat: 136 0156 8070


product recommendation

CONTACT US

Address: No5, Nanyuan Road Economic Development Zone, Zhangjiagang
Tel: +86-512-5817 0166
Fax: +86-512-5869 8850
Email: manager@wilfordboiler.com
WhatsApp:+86 136 0156 8070
WeChat: 136 0156 8070

SEND YOUR EMAIL

Questions or concerns?We’re here to help.

Site map    © Copyright 2002-2017   Zhangjiagang Wilford Thermal Co.,Ltd.